Six Sigma methodology

A quality improvement project was initiated on a Hot Dip galvanising line in a Steel Works.  The following attached defect data was obtained over a one week period.

 

Tasks

 

  1. Using the following data produce a Pareto Chart then stratify the data by
    • Machine
    • Worker
    • Day
    • Morning and afternoon shift

 

  1. Comment on your findings and explain how the company could improve its quality

 

  1. Apply two quality tools of your choice to the above situation, demonstrating how they can be used to improve the current position.

 

  1. Discuss how Six Sigma methodology can be used to plan and implement improvements in quality and in relation to the above data.
find the cost of your paper

As an intern with the local home builder’s association, you have been asked to analyze the state of the local housing market, which has suffered during a recent economic crisis.

As an intern with the local home builder’s association, you have been asked to analyze the state of the local housing market, which has suffered during a recent economic crisis…..

This question describes a simplified model of a device used to de-spin a satellite.

This question describes a simplified model of a device used to de-spin a satellite. A uniform circular disc of mass 12m and radius a lies on a smooth horizontal table….

In a diatomic molecule, one atom is very much heavier than the other and the lighter atom is free to move on a straight line through the centre of the heavier atom.

In a diatomic molecule, one atom is very much heavier than the other and the lighter atom is free to move on a straight line through the centre of the….